General

Puri disaster shelters test solar-and-battery backup for outages

Odisha’s disaster management authority and the research organisation IRADe have piloted solar power and battery storage at two multipurpose disaster shelters in Puri district. Each site has a 3-kWp solar hybrid system; officials say selected configurations could support critical shelter loads for more than 24 hours, depending on system design and requirements.

  • The reported pilot is at two shelters in Puri district, with backup duration dependent on the system and the loads it must serve.
  • The pilot sites are Narsingh Patana in Brahmagiri block and Keutajanga in Astaranga block, both in Puri district.
  • Each shelter has a 3-kWp solar hybrid system integrated with battery storage.
  • The stated backup potential of more than 24 hours applies to selected configurations and depends on design, battery capacity and critical loads.
NYOOOZ Bhubaneswar Desk · Based on 2 news reports

Did this help you understand the story?

Bhubaneswar City Brief