Escorts Mujesar-Ballabgarh section ready for passenger operations: DMRC

  • | Sunday | 18th November, 2018

(File)The 3.2 km-long Escorts Mujesar-Ballabgarh section of Delhi Metro’s Violet Line is now ready for passenger operations, the DMRC said on Sunday. After the opening of this extension, the entire Kashmere Gate – Raja Nahar Singh Metro corridor will become 46.6 km-long. All trains, which till now were operating till Escorts Mujesar, will go up to Raja Nahar Singh. A total of 40 trains will be operational on the entire Kashmere Gate – Raja Nahar Singh corridor, it said. All trains running on this section are manufactured in India,” the Delhi Metro Rail Corporation (DMRC) said in a statement.

The section will be flagged off by Prime Minister Narendra Modi on Monday through remote control. (File) The section will be flagged off by Prime Minister Narendra Modi on Monday through remote control. (File) The 3.2 km-long Escorts Mujesar-Ballabgarh section of Delhi Metro’s Violet Line is now ready for passenger operations, the DMRC said on Sunday. The section will be flagged off by Prime Minister Narendra Modi on Monday through remote control. Ballabhgarh will become the fourth city in Haryana to get metro connectivity after Gurgaon, Faridabad and Bahadurgarh. After the opening of this extension, the entire Kashmere Gate – Raja Nahar Singh Metro corridor will become 46.6 km-long. “Currently, 25.8 km of metro lines are operational across Haryana. After the opening of this section, the total length of metro kilometres in Haryana will become 29 km. All trains running on this section are manufactured in India,” the Delhi Metro Rail Corporation (DMRC) said in a statement. “The Escorts Mujesar–Raja Nahar Sigh (Ballabhgarh) section will be extremely crucial from the point of view of connectivity for the city of Ballabhgarh, Faridabad, South-East Delhi and Central Delhi areas. “Ballabhgarh is an upcoming urban settlement which is an industrial city. Large numbers of people travel everyday for their professional requirements from Ballabhgarh to Delhi and vice-versa,” the DMRC added. The Raja Nahar Singh Metro station of this section will be integrated with the Ballabhgarh Railway station and the interstate bus terminal of Ballabhgarh directly with a foot over-bridge, which is currently under construction. “A peak hour frequency of six minutes and 48 seconds will be maintained on this section between Badarpur and Raja Nahar Singh on weekdays,” the DMRC said. All trains, which till now were operating till Escorts Mujesar, will go up to Raja Nahar Singh. A total of 40 trains will be operational on the entire Kashmere Gate – Raja Nahar Singh corridor, it said. For all the latest Delhi News, download Indian Express App

If You Like This Story, Support NYOOOZ

NYOOOZ SUPPORTER

NYOOOZ FRIEND

Your support to NYOOOZ will help us to continue create and publish news for and from smaller cities, which also need equal voice as much as citizens living in bigger cities have through mainstream media organizations.


Stay updated with all the Delhi Latest News headlines here. For more exclusive & live news updates from all around India, stay connected with NYOOOZ.

Related Articles