Gujarat: Metro train will ply at 30 min interval covering six stations

Ahmedabad | Thursday | 21st February, 2019

Summary:

The next Metro train will run in the North-South corridor between APMC and the Shreyas crossing. In the first priority reach, the train will ply at an interval of 30 minutes in the East-West corridor in the first phase of Ahmedabad Metro, which includes six stations. According to Gujarat Metro Rail Corporation (GMRC) Limited sources, only two trains will ply between the six stations for first few months. In this reach, the train will ply between four stations — APMC, Jivraj Park, Rajiv Nagar and Shreyash crossing. The second phase has 24 stations and this stretch will be a continuation of North-South Corridor, connecting APMC to Mahatma Mandir..