74-km of Bareilly-Sitarganj stretch of NH-74 to be made four-laned

Bareilly | Monday | 15th October, 2018

Summary:

The detailed project report (DPR) is currently being prepared, he said.Sharma added, “Potholes have emerged at some places on the highway road due to which commuters face inconvenience, especially at night. Then work on widening the highway will be initiated.Earlier, a portion of the Bareilly-Sitapur NH-24 stretch had caved following heavy rainfall in the region is being repaired by NHAI. Besides, the authority has also begun installation of sign boards and rumble-strips on the road. The installation of safety measures and repairs of the highway will cost Rs 8.51 crore and the work will get completed within a month,” Sharma added. Bareilly: The National Highways Authority of India (NHAI) will soon be converting the seven-metre wide National Highway 74 that connects Bareilly, Pilibhit and Sitarganj in Uttarakhand into a four-lane road at an estimated cost of Rs 1,200 crore..