Threat looms over flats in Mani Majra RUB vicinity

Chandigarh | Sunday | 14th July, 2019

Summary:

Bridge work on, area dug up waterlogged, earth erodingRamkrishan UpadhyayTribune News ServiceChandigarh, July 13Delayed construction of a railway underbridge (RUB) is posing threat to several CHB flats at the Mani Majra Housing Complex (MHC) here. With heavy rains in the city, an area dug up for the RUB has got waterlogged. He said if the erosion of earth continued, the flats in the vicinity would be in danger. Area residents alleged that the RUB construction was going at a snail’s pace though such works that cause inconvenience to people should be completed on a war footing. Residents even took up the issue with UT Administrator VP Singh Badnore on January 23..