6-km stretch of Airport Road closed

Chandigarh | Tuesday | 19th September, 2017

Summary:

THE TRIBUNE IMPACTGMADA move aimed at checking further mishaps, says road beyond repairsAkash GhaiTribune News ServiceMohali, September 18GMADA finds fault with CRRI reportFinally, a 6-km-long stretch of Airport Road, from Airport Chowk to the Banur-Landran road T-point, was closed for traffic today. “The road has been “founded on black cotton soil”, on which no road can survive,” said a senior official of GMADA. GMADA has also got a sample of Airport Road checked by another agency. “When water seeps into the road and reaches the black cotton soil, the soil swells. “The report of the agency is entirely different from the CRRI report,” said the GMADA official..