It’s months since Third Main Road beneath the Chennai Bypass in Nolambur was opened up for stormwater drain work. The latest stormwater drain work was executed in the centre of Third Main Road to ensure more efficient draining. Over the last years, the road has been dug up five times, having been dug up for one civic work after another. Six months ago, the road was dug up for the new drain work. It was a case of widening and increasing the capacity of the stormwater drain system on the road..