Study to implement 24x7 drinking water supply project begins

Coimbatore | Thursday | 19th April, 2018

Summary:

The sources said that as part of the 24x7 drinking water supply project, the Corporation would build 29 water tanks to take the total tanks for water distribution to 63. more-inThe study to implement to the 24x7 drinking water supply project in the core city area – 60 wards – has begun. As part of its study, the company would also take up in-depth pilot study in R.S. It has also asked the Corporation the details and diagrams of its existing water distribution network – pipeline drawings, location of over-head tanks, number of connections and water charges collected. According to officials in the Coimbatore Corporation, Suez Project Pvt..