Construction of flyover connecting Sungam to Ramanathapuram begins

Coimbatore | Monday | 1st April, 2019

Summary:

According to the department, the ramps can be easily attached even after the construction,” he added. Once the flyover is constructed as per the existing plan, the department will have to initiate steps to construct the ramps subsequently. The implementation period of the project is two years.It will have 110 pillars, a source with the department said. “But, a lot of land need to be acquired to construct the ramps at the junctions, which is difficult to do at this point of time for practical reasons. Coimbatore: Two years down the line , travelling time of those commuting beyond Singanallur and Sungam is expected to reduce at least by 10minutes, with the national highways wing of the state highways department commencing work to construct a flyover to connect Sungam to Ramanathapuram.The 3.6km flyover, which starts at Highway Colony, will end after a private school at Sowripalayam Pirivu in Ramanathapuram..