Road closure plan for Zuari bridge work not yet approved Sudin

Goa | Tuesday | 11th December, 2018

Summary:

Similarly, with new Zuari bridge work too, our technical team will study the proposal plan. Cap of each pile of the eight-lane Zuari bridge is made of 600 trucks of concrete so you can imagine the quantum of material being used. If required, I will speak to Union ministry with a request for change in the proposal, the PWD minister said.“With Anmod road too it was proposed to close the entire stretch during the road widening, from Anmod to Khanapur. The speed of work is going on at a certain pace with this target in mind,” Dhavalikar said. Panaji: The contractor of the new Zuari bridge has proposed closure of the road from Cortalim to Verna and diverting the traffic, but the plan has not yet been approved by the state government, PWD minister Ramkrishna Dhavalikar said on Monday.A technical team of PWD engineers will study the proposed traffic diversion plan, he said..