Work on Vasai creek bridge to start soon

Mumbai | Sunday | 16th September, 2018

Summary:

more-inConstruction of the long-awaited creek bridge connecting Bhayander and Naigaon may start soon, providing relief to lakhs of motorists. “We have invited bids for the Vasai-Bhayander creek bridge, which will be opened in around a month’s time. “The new bridge will easily cut travel time by 45 minutes for motorists travelling between Vasai and Bhayander,” an MMRDA official said. The 5 km-long bridge will have six lanes, three for each side, and be constructed parallel to the existing railway bridge, across the creek. The MMRDA is also planning a road link between Dahisar and Bhayander, which will connect with the bridge between Bhayander and Naigaon..