Efforts to revive Parvathy Puthanar go in vain

Thiruvananthapuram | Tuesday | 20th August, 2019

Summary:

According to a resident, Sumesh Krishnan, the garbage included chicken waste, plastic and clothes. Proper planning must be done.”The Kerala Waterways and Infrastructures Ltd is in charge of canal rejuvenation and development. Recently, the trial run, with Minister for Cooperation, Tourism and Devaswom Kadakampally Surendran, was stopped halfway. Parvathy Puthanar canal?With an estimated cost of C150 crore, the Kerala Waterways and Infrastructures Ltd is in charge of canal rejuvenation and development. Due to the heavy deposit of garbage, the trial run on this stretch was unsuccessful..