Girders placed for Thiruvanaikovil ROB

Trichy | Tuesday | 21st November, 2017

Summary:

more-inConstruction of a new road over bridge (ROB) across the railway track at Periyar Nagar on Thiruvanaikovil Trunk Road in the city crossed a milestone with massive steel girders being placed in position for the bridge on the railway portion of the structure on Monday. Sources in the Highways Department said the bridge would be completed before the end of March. The bridge is being built by the Highways Department and the Rail Vikas Nigam Limited. About 14,000 square metres of land is to be acquired on both sides – towards Thiruvanaikovil and Mambazhasalai. The bridge, will run for a distance of about 1,430 metre and have a width of 17.20 metre..