Metro train coaches likely to reach Subhash Nagar depot from Vadodara

  • | Monday | 18th September, 2023

Three coaches will be unloaded at Subhash Nagar depot at 10 am on Monday. If everything goes well, a rake of three coaches will be loaded on the 6.22 km Orange Line from Subhash Nagar to AIIMS. However, the trial run of the metro will be between Subhash Nagar and Rani Kamalapati railway station only. The trial run will run for five to six months between Subhash Nagar and Rani Kamlapati railway station. In this, eight metro stations are being built from Subhash Nagar to AIIMS.

After completing the journey of 600 km from Vadodara in Gujarat, the metro coaches liekly to reach Bhopal late on Sunday night. Three coaches will be unloaded at Subhash Nagar depot at 10 am on Monday. After this these three boxes will be assembled. This will take about 10 to 12 days. After this, movement of the metro will be done in the depot itself. During this period, the metro will be run at a speed of one to two km per hour for safety run test. If everything goes well, a rake of three coaches will be loaded on the 6.22 km Orange Line from Subhash Nagar to AIIMS. However, the trial run of the metro will be between Subhash Nagar and Rani Kamalapati railway station only. Which will be started by Chief Minister Shivraj Singh Chauhan by showing the green flag. The trial run will run for five to six months between Subhash Nagar and Rani Kamlapati railway station. Subhash Nagar and Rani Kamlapati railway stations in Bhopal are almost ready. Between these two stations, the metro will be run initially at a speed of 10 km per hour, both single and with the entire system. Its speed will be gradually increased to 30 to 35 km per hour. The track has been designed with the capacity to run the metro at a speed of 80 km per hour. A total of 27 metros with three coaches will come to Bhopal. After the trial run of the metro, an application will be made to the Railway Safety Commissioner for approval. After this the Railway Safety Commissioner will inspect the metro. If everything goes well in this, approval will be issued. According to Metro Rail Corporation officials, the people of Bhopal can get the gift of traveling in the metro by May-June. Eight railway stations are being built here and 30.95 km metro track is proposed in Bhopal. Out of this, a priority track of seven and a half km is being made. In this, eight metro stations are being built from Subhash Nagar to AIIMS. Out of this, eight stations are being built in Subhash Nagar, Kendriya Vidyalaya, Board Office Square, MP Nagar Zone-2, Rani Kamalapati, DRM Office, Alkapuri and AIIMS.

If You Like This Story, Support NYOOOZ

NYOOOZ SUPPORTER

NYOOOZ FRIEND

Your support to NYOOOZ will help us to continue create and publish news for and from smaller cities, which also need equal voice as much as citizens living in bigger cities have through mainstream media organizations.


Stay updated with all the Bhopal Latest News headlines here. For more exclusive & live news updates from all around India, stay connected with NYOOOZ.

Related Articles